Skip to content
G-advisory
  • About us
  • Team
  • ServicesExpand
    • Energy
    • Sustainability and ESG
  • Offices
  • ProjectsExpand
    • Energy projects
    • Sustainability and ESG projects
  • News
Linkedin
  • Esp
  • Eng
  • Fr
G-advisory
Linkedin

Sustainability and ESG projects

Technical and ESG advisory for the acquisition and financing of a biomethane production plant in Tarragona

Technical and ESG advice for the acquisition and subsequent financing of a biomethane production plant in Tarragona (Spain), with a production capacity of 50 GWh/year.

Technical Due Diligence for the sale of Saeta Yield, a renewable energy company in Spain and Portugal, with 47 wind farms and 34 photovoltaic plants in operation and development

Technical due diligence for the sale of Saeta Yield, a renewable energy company operating in Spain and Portugal, with a portfolio of 47 wind farms (1,120 MW) and 34 photovoltaic plants (902 MW) both in operation and under development.

Technical advice and ESG on the funding of solar energy plants

Technical advice and ESG on the funding of 2 solar energy plants in Portugal, with a combined power of 272 MWp.

Technical advice on the acquisition of a stake in a biomethane plant

Technical advice on the acquisition of a majority share in a biomethane production plant using chicken manure under development in Zaragoza, with a treatment capacity of 73,000 tons per year.

Technical report in relation to the BREF and the limit values of atmospheric emissions applicable to an IPPC industry

Assistance with the preparation of a technical report in relation to the BREF and the limit values of atmospheric emissions applicable to an IPPC industry in the agri-food industry (forage drying and preparation of fodder).

Strategic document on the waste market

Preparation of a strategic document on the current and future situation of the waste market in Spain.

Second opinion in relation to compliance with the Green Bond Principles

Issue of a report providing a second opinion on compliance with the Green Bond Principles (GBP) of the ICMA, in the context of the securitization of receivables in relation to the installation of own use solar energy facilities on the roofs of various different industrial facilities in Spain.

Second opinion on the granting of a green loan

Second opinion on the granting of a green loan and evaluation in accordance with the Equator Principles of 4 solar energy plants in Chile.

Estimated revenue from a hydroelectric power plant

Estimate of the expected revenue from a 357 MW hydraulic pumping plant.

Financing of a gasification plant

Financing of a gasification plant.

Wind farms in Tamaulipas, Mexico

Environmental and social advisor to the lenders for the financing of two wind farms (117 MW and 171 MW) located in the state of Tamaulipas.

Water company in Brazil

Technical due diligence for the grant of a USD 453 million loan for investments aimed at reducing water losses and improving energy efficiency at a state-owned water company serving more than 6 million people.

Preliminary climate change resilience action plan

Preliminary climate change resilience action plan.

Implementation of the EU ETS for Mercadona

Analysis of the implementation of the European Emissions Trading Scheme (EU ETS) for a Mercadona logistics facility.

Eolia ESG framework

Definition of the Eolia ESG framework: policies, procedures and other measures.

Sustainability Plan of the OMI Group

Sustainability Plan of the OMI Group.

Carbon footprint of waste-to-energy technologies

Analysis of the carbon footprint of the urban waste-to-energy sector and comparison with the carbon footprint of urban waste landfills.

PV plant in Argentina

Environmental and social due diligence based on the IFC performance standards for the financing of a 200 MW photovoltaic plant in Salta, Argentina.

Waste tyre pyrolysis plant

Technical due diligence for the financing of a plant for the treatment of end-of-life tyres by pyrolysis, with a treatment capacity of 27,000 t/year of used tyres and obtainment of by-products, within the framework of the circular economy: carbon black, metals and synthetic oil.

Slurry treatment and cogeneration plants

Technical and environmental due diligence of 6 slurry treatment plants with cogeneration, 5 of them by slurry drying and one with chemical treatment, with a total installed capacity of 90 MW.

GMC1 waste treatment complex in San Sebastián

Technical and environmental due diligence for the financing and supervision of the construction of the GMC1 urban waste treatment and waste-to-energy complex, with a treatment capacity of 242,362 t/year and an installed capacity of 21.5 MW.
  • About us
  • Team
  • Services
    • Energy
    • Sustainability and ESG
  • Offices
  • Projects
    • Energy projects
    • Sustainability and ESG projects
  • News
Do you want to work with us? Our activity on LinkedIn

CONTACT

    The controller of the personal data provided in the contact form is G-advisory Consultoría Técnica, Económica y Estratégica, S.L.P. (G-advisory), which has a legitimate interest in processing such data in order to attend to any queries you make through the form. According to the query raised, we may have to disclose your personal data to Garrigues Group companies and G-advisory service providers may have access to your data. You have the right to access, rectify and erase your data, as well as other rights explained in additional information on privacy.

    By clicking “Send”, you state that you know and understand G-advisory’s privacy policy.

    © 2025 G-advisory

    • Legal conditions
    • Privacy policy
    • Cookies policy
    Scroll to top
    • About us
    • Team
    • Services
      • Energy
      • Sustainability and ESG
    • Offices
    • Projects
      • Energy projects
      • Sustainability and ESG projects
    • News
    • Esp
    • Eng
    • Fr
    We use first-party analytics cookies to collect traffic and performance statistics.
    You can accept or refuse the use of these cookies by clicking on the relevant button below.
    You can change your preferences at any time by clicking on the link at the bottom of the Website. For further information, please consult our Cookies Policy
    ACCEPTREFUSE