Skip to content
G-advisory
  • About us
  • Team
  • ServicesExpand
    • Energy
    • ESG
  • Offices
  • ProjectsExpand
    • Energy projects
    • ESG projects
  • News
Linkedin
  • Esp
  • Eng
  • Fr
G-advisory
Linkedin

ESG projects

Wind farms in Tamaulipas, Mexico

Environmental and social advisor to the lenders for the financing of two wind farms (117 MW and 171 MW) located in the state of Tamaulipas.

Water company in Brazil

Technical due diligence for the grant of a USD 453 million loan for investments aimed at reducing water losses and improving energy efficiency at a state-owned water company serving more than 6 million people.

Preliminary climate change resilience action plan

Preliminary climate change resilience action plan.

Implementation of the EU ETS for Mercadona

Analysis of the implementation of the European Emissions Trading Scheme (EU ETS) for a Mercadona logistics facility.

Eolia ESG framework

Definition of the Eolia ESG framework: policies, procedures and other measures.

Sustainability Plan of the OMI Group

Sustainability Plan of the OMI Group.

Carbon footprint of waste-to-energy technologies

Analysis of the carbon footprint of the urban waste-to-energy sector and comparison with the carbon footprint of urban waste landfills.

PV plant in Argentina

Environmental and social due diligence based on the IFC performance standards for the financing of a 200 MW photovoltaic plant in Salta, Argentina.

Waste tyre pyrolysis plant

Technical due diligence for the financing of a plant for the treatment of end-of-life tyres by pyrolysis, with a treatment capacity of 27,000 t/year of used tyres and obtainment of by-products, within the framework of the circular economy: carbon black, metals and synthetic oil.

Slurry treatment and cogeneration plants

Technical and environmental due diligence of 6 slurry treatment plants with cogeneration, 5 of them by slurry drying and one with chemical treatment, with a total installed capacity of 90 MW.

GMC1 waste treatment complex in San Sebastián

Technical and environmental due diligence for the financing and supervision of the construction of the GMC1 urban waste treatment and waste-to-energy complex, with a treatment capacity of 242,362 t/year and an installed capacity of 21.5 MW.
  • About us
  • Team
  • Services
    • Energy
    • ESG
  • Offices
  • Projects
    • Energy projects
    • ESG projects
  • News
Do you want to work with us?
Our activity on LinkedIn

CONTACT

    The controller of the personal data provided in the contact form is G-advisory Consultoría Técnica, Económica y Estratégica, S.L.P. (G-advisory), which has a legitimate interest in processing such data in order to attend to any queries you make through the form. According to the query raised, we may have to disclose your personal data to Garrigues Group companies and G-advisory service providers may have access to your data. You have the right to access, rectify and erase your data, as well as other rights explained in additional information on privacy.

    By clicking “Send”, you state that you know and understand G-advisory’s privacy policy.

    © 2023 G-advisory

    • Legal conditions
    • Privacy policy
    • Cookies policy
    Scroll to top
    • About us
    • Team
    • Services
      • Energy
      • ESG
    • Offices
    • Projects
      • Energy projects
      • ESG projects
    • News
    • Esp
    • Eng
    • Fr